Key points
- Old drawings are a starting point, not a measurement — verify the existing system in the field.
- Compatibility between new and existing components is a design question to settle early.
- The best-run shutdown windows contain only the tie-in work itself.
- Update the drawings afterwards, so the next change starts from the truth.
What counts as a retrofit
A retrofit is any change to an existing conveyor system: extending a line, adding a merge or divert, rerouting conveyor around a new process, relocating equipment, adding accumulation or capacity, or replacing worn and outdated components. What all of these share is that the new work has to fit equipment that was installed years earlier — often by someone else, and often modified since.
Verify the existing system in the field
As-built drawings drift from reality over a system’s life. Before anything is designed in detail, the existing equipment at every point the new work touches should be measured: elevations, widths, frame profiles, support locations, drive positions and the condition of the components the new work will connect to. A tie-in designed to a drawing that is a few inches out becomes a field modification under time pressure.
Settle compatibility questions early
New and existing equipment have to work together mechanically. The manufacturer or integrator responsible for the design should confirm questions such as:
- Do frame profiles, bed widths and roller centres match, or is a transition section needed?
- Can existing supports carry the new arrangement, or do they need to be replaced?
- Do new drives and speeds suit the existing line (the controls side is normally the integrator’s scope)?
- Does the modified area need guarding brought up to the current design, not the original one?
Mixing equipment from different manufacturers is common and usually workable — but it is a design decision, not something to resolve in the field.
Phasing and shutdown windows
Most retrofits need at least some time with the existing line stopped. Those windows are short and fixed, so the planning principle is simple: anything that can be done before the window, is done before the window.
Before the window
- Walk every tie-in point with the facility team.
- Pre-assemble new sections off-line and stage materials at the point of use.
- Confirm lockout, permits and access under the facility’s procedures.
- Agree the crew size, the sequence and the restart plan.
During the window
- Remove or cut existing equipment exactly as planned.
- Install the tie-ins and new transfers, and check their alignment.
- Reinstall guarding before anything restarts.
After the window
- Support the restart and testing by the facility and the integrator.
- Close the punch list and plan the next phase from what was learned.
Managing risk in an operating building
Existing conveyor is connected to power and controls, so work on it is governed by hazardous-energy control — OSHA 29 CFR 1910.147 sets the federal requirements for general industry, and the facility’s own procedures apply on site. Cutting or other hot work may need a facility permit. Work areas next to live equipment need physical separation, and dust, noise and debris need controlling where the operation continues alongside.
A rollback plan is the most underrated part of retrofit planning. If a tie-in cannot be completed inside its window, everyone should already know how the existing line is restored and who makes that call.
Document the change
When the work is done, the drawings should be marked up to reflect what was actually installed and handed to whoever maintains the system’s documentation. The next retrofit will start from those drawings — accurate records are the cheapest risk reduction there is.
Retrofit planning checklist
- Field verification of every tie-in point
- Compatibility confirmed by the manufacturer or integrator
- Phasing plan and agreed shutdown windows
- Pre-assembly and staging plan
- Lockout, permits and separation agreed with the facility
- Rollback plan and go/no-go point for each window
- As-built markups after completion
How ESCMAR fits
ESCMAR installs retrofits, expansions, line modifications and component upgrades, planned around existing equipment and the facility’s schedule. See System Retrofits & Upgrades.
References
- OSHA 29 CFR 1910.147 — The Control of Hazardous Energy (Lockout/Tagout) (opens in a new tab)
Federal requirements for keeping machinery de-energized during servicing and maintenance.
- ASME B20.1 — Safety Standard for Conveyors and Related Equipment (opens in a new tab)
The U.S. consensus safety standard covering conveyor design, construction, installation, maintenance, inspection and operation (current edition 2024).
Standards are referenced for context only — consult the current edition and your project’s specifications. ESCMAR does not claim certification to any standard listed.