Industry 01 · Parcel & Postal
Installation for high-volume parcel and postal operations.
Installation support for high-volume parcel, shipping, sorting, and postal operations.
In a parcel building, throughput is the specification. Induction, sortation and the routing to every destination have to be installed to run at volume — very often against a fixed network date.
- Industry
- 01 — Parcel & Postal
- Environments
- Parcel hubs · Shipping · Sorting · Postal operations
- Discipline
- Mechanical installation
- Coverage
- Nationwide, from Houston, TX
01What’s different here
What parcel & postal installations demand.
- 01
Throughput sets the tolerance
Parcel streams mix boxes, polybags, envelopes and irregular items. Every transfer, merge and length of guide rail has to hand that mix off cleanly at speed, so alignment at the transfers gets as much attention as the long runs.
- 02
Induction and routing are one system
Unload and induction lines, the sorter, and the routing to chutes, doors and outbound lanes only work together. Installation is sequenced so each part is ready when the next one needs it.
- 03
Schedule-sensitive sites
Hubs often run around the clock, and new capacity is tied to peak season or a network launch. Work in operating buildings is phased into areas and windows that keep parcels moving.
02Systems & environments
Where the conveyor goes.
Environments ESCMAR supports
- Parcel hubs
- Shipping
- Sorting
- Postal operations
Experience includes work associated with facilities and projects involving organizations such as FedEx.
Typical systems
- 01Unload and induction lines
- 02Gapping and merge conveyor
- 03Sortation lines and diverts
- 04Chutes and destination routing
- 05Outbound and loading conveyor
- 06Elevated crossovers and mezzanine lines
03Planning notes
Plan backwards from the go-live date.
Between today and go-live sit the equipment deliveries, the mechanical installation, the integrator’s testing and any phased cut-overs. Each needs its own time, so the installation window is usually shorter than it first looks.
In an operating hub, agree early which areas can be taken out of service, when, and for how long — and how deliveries reach the work without blocking the docks.
Before installation starts
- Network or peak-season go-live date
- Phasing and cut-over plan for live areas
- Integrator testing time before go-live
- Delivery access that keeps docks clear
- Overhead coordination with other trades
04Relevant services
ESCMAR services for parcel & postal.
05FAQ
Parcel & Postal questions.
Something specific about your project? Email info@escmarconveyors.com.
Work in operating buildings is planned into separated areas and agreed windows. ESCMAR’s teams are experienced in active distribution environments, and the phasing is agreed with the facility and the integrator before work starts.
Yes. ESCMAR provides the mechanical installation and works alongside the integrator, who normally designs the system and delivers its controls and commissioning.
ESCMAR provides additional installation capacity for projects operating under compressed timelines. Share the date and the state of the work, and the team will give you a realistic assessment.
Request a quote
Adding parcel capacity?
Share the site, the system and the date it has to run. ESCMAR will follow up on phasing, crews and mobilization.
Helpful to include
- 01Site location and operating hours
- 02Sortation manufacturer or integrator
- 03Go-live or peak date
- 04Phasing constraints
- 05Drawings or scope