Mechanical conveyor installation, aligned to the drawings.

ESCMAR installs conveyor systems for distribution, fulfillment and manufacturing facilities across the United States — setting supports, beds, drives and guarding to approved drawings, alongside the integrator, the equipment manufacturer and the general contractor.

ALIGNMENT DATUMTOP OF ROLLER ELEV.1BED · ROLLERS2SIDE GUARD3SUPPORTS4DRIVE
Fig. 01Typical conveyor section, elevation — illustrative
Service
01 — Conveyor installation
Discipline
Mechanical installation
Works from
Approved installation drawings
Coverage
Nationwide, from Houston, TX

01Scope

What mechanical conveyor installation covers.

Mechanical conveyor installation is the physical assembly of a conveyor system on site: receiving and staging the equipment, setting supports at the specified elevations, joining and aligning conveyor sections, mounting drives, and fitting guarding and guide rail — so the system matches the approved layout and is ready for electrical work, controls and start-up by the responsible parties.

  1. Bed & rollers

    Conveyor sections set, joined and squared to each other, with roller and belt beds levelled so product tracks true from one section to the next.

  2. Side guard & guide rail

    Guide rail, side guards and guarding installed wherever the drawings call for them — the parts that keep product on the line and people away from moving equipment.

  3. Supports

    Floor supports set to elevation and anchored as specified; on elevated lines, stands, hangers or structure-mounted supports as the drawings and the project’s engineers define.

  4. Drives

    Drive units and transmission components mounted and mechanically connected. Electrical connection, controls and commissioning are normally by others and set out in the project scope.

Numbers refer to the callouts in Fig. 01.

02Applications

Floor-level and elevated lines.

The same discipline, different problems: floor-level work is about layout accuracy around a busy floor; elevated work adds lifting, access and the overhead space.

Floor-level

Lines on floor supports in receiving, picking, packing and shipping areas. The work centres on setting out the layout from the drawings’ reference points, holding support elevations, anchoring as specified and keeping aisles and egress routes clear.

  • Layout from reference lines
  • Support elevations to the drawings
  • Anchoring as specified
  • Aisle and equipment clearances

Elevated

Lines on stands, mezzanines or hung from the building structure, carrying product over working floors. Lifting and access are planned up front, the overhead space is shared with sprinklers, lighting and other trades, and the area below is protected while crews work above it.

  • Lift and access planning
  • Supports and hangers per the drawings
  • Sequencing with overhead trades
  • Exclusion zones below the work
Several elevated conveyor lines crossing a new distribution building, with a boom lift and yellow column guards on the floor below
PhotoStacked elevated conveyor lines spanning a distribution building. ESCMAR installation site.

03Drawings & coordination

Installed to the drawings. Coordinated with everyone else.

The approved installation drawings define the layout, the elevations and often the sequence. ESCMAR installs to those drawings and the project specifications. Where site conditions don’t match the drawing — a column, a slab edge, a sprinkler main — it is raised with the project team and resolved before the work goes in, not improvised in the field.

On most projects the manufacturer or integrator supplies the equipment and the design, the general contractor controls the site, and ESCMAR provides the mechanical installation. Day to day that means agreeing deliveries, laydown, lifts and work areas with the people around us.

04Installation sequence

How a conveyor installation runs.

A typical sequence. Each project’s is agreed with the customer and the other contractors on site.
  1. Step 01

    Review & plan

    Drawings, scope split, schedule and site rules reviewed with the project team before crews travel.
  2. Step 02

    Receive & stage

    Deliveries checked against packing lists and staged in laydown areas in the order they will be installed.
  3. Step 03

    Layout

    Reference lines and elevations marked out from the drawings, so every support lands where the design puts it.
  4. Step 04

    Set & align

    Supports, sections, drives and guarding installed, levelled and aligned, transfer by transfer.
  5. Step 05

    Walkdown & handover

    Punch list worked with the project team; mechanically complete areas handed over for electrical, controls and start-up.

05Site readiness & scheduling

Ready for crews to start.

Installation goes fastest when the site is ready before crews arrive. The schedule is built around equipment deliveries, the other trades and the facility’s operation, and crew size is set to match it. ESCMAR mobilizes from Houston to projects nationwide.

  • Installation drawings issued and approved
  • Equipment delivery dates confirmed
  • Laydown and staging space near the work area
  • Floor, mezzanine or structure ready to receive equipment
  • Lifts and site equipment — who provides what
  • Site access, safety orientation and working hours
  • Temporary power and lighting for the work
  • Other trades scheduled in the same area

07FAQ

Conveyor installation questions.

Something specific about your project? Email info@escmarconveyors.com.

  • No. ESCMAR is a mechanical installation contractor. The equipment and the system design come from the conveyor manufacturer or the system integrator; ESCMAR installs it to their approved drawings and specifications.

  • Yes. Installation covers floor-level lines and elevated conveyor on stands, mezzanines and structure-supported hangers, set to the elevations on the drawings.

  • Those are normally provided by the system integrator or other contractors. ESCMAR’s scope is the mechanical installation; the split between trades is confirmed for each project before work starts.

  • Crews install the equipment specified for the project by its manufacturer or integrator. Name the manufacturer in your quote request so the team can confirm the fit for your project.

  • The project location, layout drawings or a scope document, the equipment manufacturer or integrator, whether the lines are floor-level, elevated or both, and the target schedule. Send what you have — the team will follow up on anything missing.

Request a quote

Planning a conveyor installation?

Send the location, the layout drawings and your target schedule. ESCMAR will follow up on scope, crew size and mobilization.

Helpful to include

  • 01Project location
  • 02Layout drawings or scope
  • 03Equipment manufacturer or integrator
  • 04Floor-level, elevated or both
  • 05Target start and completion